Permitting & Code Quick Facts
Standard building permit required before initiating a residential solar installation.
Average expected timeframe for the building department to review plans and issue approval.
Local inspector visual/technical code verification required for certificate of approval.
Minimum roof setback pathway (in inches) required for emergency fire access.
Whether a professional structural engineer (PE) certified review letter is mandatory.
Indicates if the electrical permit application is standalone or combined with the building permit.
Contact & Interconnection
Local Permitting Notes
Inspectors are available for scheduling on Tuesdays and Thursdays.